YEAR
|
PROJECT
|
COSTS
|
|
1970
|
Water system installed by developer (Puget Sound Exchange Corp.)
|
$147,000.00
|
|
1979
|
Received well, tank, water mains, pipes valves, and fire hydrants from Puget Sound Exchange Corp.as result of law suit between PSEC and newly formed Bridgehaven Community Club
|
$1.00
|
|
1982
|
Installed four fire hydrants on North Beach Drive
|
Paid by spit lot owners
|
|
1985
|
Replaced washed out 6 inch main with 8 inch main and rerouted through Admirals Row lots
|
Paid by Schoenfelt
|
|
1985
|
Installed 8 inch main from Eagle View to Seattle Drive on Thorndyke Rd.
|
Paid by lot owners
|
|
1985
|
Installed second pressure station and 8 inch main from Admirals Row through CPP, Deputy short plot, and Trails End lots down Dickey Street
|
Paid by Schoenfelt($41,713.41)
|
|
1989
|
Acquired 240 x 100 feet of property from Pope Resources for sanitary behind wells on Robin Lane
|
$2,085.00
|
|
1990
|
Installed well # 2 (standby well) drilling, pipes, pumps, and motor
|
$18,515.00
|
|
1991
|
Installed 8 inch main from Blue Jay to Marina
|
Paid by Shold (Bid $28,816.00)
|
|
1991
|
Installed aerator system in water tank and four inch feeder line from pump house to tank
|
Paid by Pederson (Bid $63,246.00)
|
|
1992
|
Installed 8 inch main from Seattle Drive to 90 degree turn on Thorndyke Road
|
Paid by Pederson (Bid $63,246.00)
|
|
1995
|
Installed 8 inch main with valves and hydrants from Dickey and Blue Jay to South Beach Drive to North Beach Drive
|
Paid by Pederson(Bid $103,031.00)
|
|
1997
|
Upgrade Eagle View main from two inch to six inch pipe
|
$30,000.00
|
|
1998
|
Superior Court of Jefferson Co. Ruled in Bridgehaven's favor in trial over title to property that our water tank is located
|
Legal fees est. at $10,000
|
|
1999
|
New 400 amp service, 40 hp pump and motor, drop pipe, pump controller, phase converter, and transformer in pump house
|
$49,212.80
|
|
1999
|
Emergency generator and building
|
$15,000
|
|
2000
|
New water tank level floats with controller
|
$750.00
|
|
2001
|
Installed missing fire hydrant on Thorndyke Road plus air valve relocation on Thorndyke Rd. Changed ten service lines to larger mains
|
$7,200.00
|
|
2002
|
Replaced pump house plumbing (new iron pipe, couplings, valves and master flow meter)
|
$6,700.00
|
|
2004
|
Built second water tank
|
$114,877.75*
|