Aqua-barWaterSystemHistory

YEAR

PROJECT

COSTS

1970

Water system installed by developer (Puget Sound Exchange Corp.)

$147,000.00

1979

Received well, tank, water mains, pipes valves, and fire hydrants from Puget Sound Exchange Corp.as result of law suit between PSEC and newly formed Bridgehaven Community Club

$1.00

1982

Installed four fire hydrants on North Beach Drive

Paid by spit lot owners

1985

Replaced washed out 6 inch main with 8 inch main and rerouted through Admirals Row lots

Paid by Schoenfelt

1985

Installed 8 inch main from Eagle View to Seattle Drive on Thorndyke Rd.

Paid by lot owners

1985

Installed second pressure station and 8 inch main from Admirals Row through CPP, Deputy short plot, and Trails End lots down Dickey Street

Paid by Schoenfelt($41,713.41)

1989

Acquired 240 x 100 feet of property from Pope Resources for sanitary behind wells on Robin Lane

$2,085.00

1990

Installed well # 2 (standby well) drilling, pipes, pumps, and motor

$18,515.00

1991

Installed 8 inch main from Blue Jay to Marina

Paid by Shold (Bid $28,816.00)

1991

Installed aerator system in water tank and four inch feeder line from pump house to tank

Paid by Pederson (Bid $63,246.00)

1992

Installed 8 inch main from Seattle Drive to 90 degree turn on Thorndyke Road

Paid by Pederson (Bid $63,246.00)

1995

Installed 8 inch main with valves and hydrants from Dickey and Blue Jay to South Beach Drive to North Beach Drive

Paid by Pederson(Bid $103,031.00)

1997

Upgrade Eagle View main from two inch to six inch pipe

$30,000.00

1998

Superior Court of Jefferson Co. Ruled in Bridgehaven's favor in trial over title to property that our water tank is located

Legal fees est. at $10,000

1999

New 400 amp service, 40 hp pump and motor, drop pipe, pump controller, phase converter, and transformer in pump house

$49,212.80

1999

Emergency generator and building

$15,000

2000

New water tank level floats with controller

$750.00

2001

Installed missing fire hydrant on Thorndyke Road plus air valve relocation on Thorndyke Rd. Changed ten service lines to larger mains

$7,200.00

2002

Replaced pump house plumbing (new iron pipe, couplings, valves and master flow meter)

$6,700.00

2004

Built second water tank

$114,877.75*